ZEXGONEST 10×12 FT Metal Storage Shed – Heavy Duty Outdoor Shed with Lockable Double Doors, Sloped Roof & Vents for Garden Tools & Equipment
$369.99 Original price was: $369.99.$258.99Current price is: $258.99.
✓ In stock
Organize your backyard and protect your outdoor equipment with the ZEXGONEST 10×12 FT Metal Storage Shed. Made from premium galvanized steel with a professional sloped roof design, this sturdy shed offers spacious storage for garden tools, snow blowers, bicycles, outdoor furniture, and more.
Why Choose ZEXGONEST?
Built with high-quality galvanized steel, this shed is engineered to withstand tough outdoor weather for reliable daily protection. The lockable double doors provide excellent anti-theft performance, while built-in top vents ensure proper air circulation to prevent stuffiness and moisture accumulation for long-term storage.
Key Features
-
Durable Outdoor Shed – Made of premium galvanized steel that withstands tough outdoor weather for reliable daily protection. Versatile use for garden tools, pet house, or trash bin enclosure.
-
Spacious Internal Storage – Accommodates snow blowers, shovels, outdoor chairs, bicycles, and other daily outdoor supplies. Helps tidy up messy backyard spaces easily.
-
All-Weather Rainproof Shelter – Professional sloped roof design maximizes inner space and speeds up rainwater runoff effectively. Reduces rainwater buildup and water seepage, protecting stored items from wetness.
-
Safe Lockable Door & Fresh Air Vent – Lockable door offers great anti-theft performance and keeps stray small animals out. Two built-in top vents enhance natural air circulation, avoiding stuffiness and moisture accumulation.
-
User-Friendly Easy Installation – All components come with clear part number labels, matched with detailed step-by-step instruction manual and installation gloves. 2-3 people recommended for efficient assembly.
What’s Included
Complete storage shed kit including all panels, hardware, installation gloves, and instruction manual. Assembly required.
Specifications
| Specification | Details |
|---|---|
| Brand | ZEXGONEST |
| Manufacturer | ZEXGONEST |
| Model Number | STS2601-GR10x12-1 |
| Manufacturer Part Number (MPN) | STS2601-GR10x12-1 |
| Size | 10×12 FT |
| Color | Gray |
| Base Material | Metal |
| Top Material Type | Metal |
| Frame Material | Alloy Steel |
| Product Dimensions (D x W x H) | 143.76″ x 77.5″ x 118″ |
| Floor Area | 120 square feet |
| Door Style | Double Hinged Doors (Lockable) |
| Water Resistance Level | Water Resistant |
| Roof Type | Sloped Roof |
| Ventilation | Two Built-in Top Vents |
| Style | Utility |
| Recommended Uses | Garden Tools, Snow Blowers, Bicycles, Outdoor Furniture, Pet House, Trash Bin Enclosure |
| Assembly Required | Yes (2-3 People Recommended) |
Related products
Aoxun 10×12 FT Hardtop Gazebo – Double Galvanized Steel Roof with Netting & Curtains for Patio, Backyard & Outdoor Dining
In stock
Devoko 5×4 FT Outdoor Storage Shed – Plastic Shed with Floor, Lockable Door & Window for Garden Tools & Pool Supplies
In stock
MNLR 6×10 FT Outdoor Storage Shed – Resin Shed with Floor, Window & Lockable Door for Garden Tools, Bikes & Lawn Mowers
In stock
Patiowell 6×4 FT Outdoor Storage Shed – Plastic Resin Shed with Floor, Lockable Door & UV Protection for Garden Tools, Bikes & Lawn Equipment
In stock
Rubbermaid 4×2.5 FT Vertical Storage Shed – Resin Outdoor Cabinet with Floor for Garden Tools, Pool Chemicals & Patio Cushions
In stock
Shark AI Robot Vacuum with XL HEPA Self-Empty Base – 60-Day Capacity & Matrix Clean Navigation – AV2501AE (Black)
In stock
Suncast Horizontal Storage Shed – 98 cu ft Resin Shed with Sliding Lid & Lockable Doors for Bikes, Mowers & Patio Furniture
In stock
ZYJOYY 6×4.4 FT Outdoor Storage Shed – 16mm Resin Shed with Floor, Window & Lockable Doors for Backyard, Garden Tools & Bikes
In stock
